引用本文: | 郭熙,黄俊,马文娜,周小清,邓京虎,周就猫,陈美球.鄱阳湖滨湖平原区土地整治工程模式研究[J].中国农业资源与区划,2014,35(1):102~108 |
| |
|
摘要: |
我国地域辽阔,不同地形地貌在气候、土壤和社会经济状况等方面具有不同的特征。在对不同的地貌类型进行土地整治时,土地整治有明显的差异性。鄱阳湖滨湖平原区土地整治方向是调整农业产业结构,持续发展种植业,积极发展林、牧、副、渔等产业,整治以治水为主,完善排灌渠系,加固沿河圩堤,加强湖区防护林建设,提高防洪抗灾能力,治理水旱灾害,减轻土壤污染。该文在总结鄱阳湖滨湖平原区土地整治项目工程特征的基础上,探讨与之相适合的土地整治项目工程规划设计的技术方法,并以南昌县蒋巷镇五丰村等两个村土地整治项目为例,应用鄱阳湖滨湖平原区的土地整治项目工程特征分析成果,对项目区工程进行了具体的规划设计。 |
关键词: 鄱阳湖滨湖平原区 土地整治 工程模式 |
DOI:10.7621/cjarrp.1005-9121.20140115 |
分类号: |
基金项目: |
|
STUDY ON LAND CONSOLIDATION ENGINEERING MODEL IN THE PLAIN ROUND THE POYANG LAKE |
Guoxi1, Huang Jun2, MaWenna1, Zhou Xiaoqing3, Deng Jinghu4, Zhou Jiumao4, Chen Meiqiu1
|
1.College of Land Resource and Environment, Jiangxi Agricultural University, Nanchang330045;2.Geology Surveying Institution of Jiangxi province, Nanchang330029;3.Land and Resources Bureau of Nanchang City in Jiangxi Province, Nanchang 330045;4.Surveying and Planning Coal Institute of Jiangxi Province, Nanchang330045
|
Abstract: |
China has a vast territory,a complex and diverse terrain.Different topography has different climate, soil and socio-economic characteristics Therefore, the land consolidation work has significant differences in the different topography. Taking Poyang Lake as an example, the Land consolidation direction is to adjust the agricultural structure, promote the sustainable development of agriculture, actively develop forestry, animal husbandry, and fisheries and other industries, improve the irrigation and drainage canal, strengthen Lake shelter construction to increase flood and droughts resilience. Based on summarizing the project characteristics of land consolidation in the plain round the Lake, this study explored the technical methods for project planning and design of land consolidation, designed the project engineering, using the analysis results for the project engineering characteristics of land consolidation by introducing the example of two villages' land consolidation project such as Wu Feng village, Jiang Xiang town, Nanchang county. |
Key words: land consolidation engineering characteristics the plain round the lake |