HOW TO STRENGTHEN THE MANAGEMENT OF COST CONTROL UNDER THE"08STANDAD" |
Zhou Xia
|
(Chinese academy of agricultural sciences, Beijing 100081)
|
Abstract: |
The national standard GB 50500-2008, "the valuation standard of quantities of the construction projects " was implemented on December 1,8, which established the fair cooperation mechanism between the prime contractor and the developer, but practically, the tenderee usually lack of professional knowledge and professional management, which makes the tenderer afford more risk during the project management. Therefore, the owner must fully understand their own management responsibility and the risk, and must take effective measures to do well the design, the list of preparation, contract compile work before a project implement, strictly control the project change, so as to extremely reduce the cost control management risk. |
Key words: quantities of the construction projects cost control design quality contract |